{"id":15802,"date":"2025-02-13T19:46:47","date_gmt":"2025-02-13T19:46:47","guid":{"rendered":"https:\/\/drtcapurimac.gob.pe\/portal\/?p=15802"},"modified":"2025-02-13T19:46:49","modified_gmt":"2025-02-13T19:46:49","slug":"gobernador-percy-godoy-anuncia-paquete-de-obras-por-mas-750-millones","status":"publish","type":"post","link":"https:\/\/drtcapurimac.gob.pe\/portal\/gobernador-percy-godoy-anuncia-paquete-de-obras-por-mas-750-millones\/","title":{"rendered":"GOBERNADOR PERCY GODOY ANUNCIA PAQUETE DE OBRAS POR M\u00c1S 750 MILLONES"},"content":{"rendered":"\n<p><img loading=\"lazy\" decoding=\"async\" height=\"16\" width=\"16\" alt=\"\u2b55\ufe0f\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t39\/1\/16\/2b55.png\">Hist\u00f3rico presupuesto para obras en la regi\u00f3n<\/p>\n\n\n\n<p> El gobernador regional, Percy Godoy Medina, anunci\u00f3 en conferencia de prensa la ejecuci\u00f3n de m\u00e1s de 757 millones de soles en proyectos de inversi\u00f3n para el a\u00f1o 2025, destinados a la continuidad e inicio de obras en las siete provincias de Apur\u00edmac.<\/p>\n\n\n\n<p>Entre algunas de las obras anunciadas por la primera autoridad regional destacan:Infraestructura vial: V\u00eda alterna para Abancay 80 millones de soles, asfaltado del corredor econ\u00f3mico Abancay-Grau 50 millones de soles, carretera de interconexi\u00f3n regional Antabamba-Arequipa (convenio con la Municipalidad de Antabamba)<\/p>\n\n\n\n<p>Educaci\u00f3n: Construcci\u00f3n de la I.E. Integrada La Salle (obra en ejecuci\u00f3n) 90 millones de soles, Instituto Tecnol\u00f3gico de Progreso (Grau) 20 millones de soles, Institutos tecnol\u00f3gicos de Haquira \u2013 37 millones de soles y Chincheros 18 millones de soles; construcci\u00f3n de Instituciones Educativas en Pata Pata, Se\u00f1or de la Exaltaci\u00f3n y Fidelia Valenzuela (Grau) 31 millones de soles; I.E. Apumarca (Mara) 13 millones de soles.<\/p>\n\n\n\n<p>Riego: Sistema de riego en 25 comunidades de Andahuaylas \u2013 S\/ 84 millones, sistema de riego de Sabaino y Huaquirca 8 millones de soles.<\/p>\n\n\n\n<p>Salud: Construcci\u00f3n del establecimiento de salud en Cotaruse (Aymaraes) 27 millones de soles, establecimientos de salud en Mollebamba y Totora Oropesa 47 millones de soles.<\/p>\n\n\n\n<p>Infraestructura urbana: Construcci\u00f3n de la defensa ribere\u00f1a de Chalhuanca 67 millones de soles, construcci\u00f3n de pistas y veredas en Antabamba 27 millones de soles, pistas y veredas en Calcauso, distrito de Juan Espinoza Medrano 7.5 millones de soles.<\/p>\n\n\n\n<p>Otros proyectos: Construcci\u00f3n del estadio de Tambulla 8 millones de soles y la implementaci\u00f3n de 40 puentes modulares en un periodo de 16 meses (en coordinaci\u00f3n con el Ministerio de Transportes).<\/p>\n\n\n\n<p>Este presupuesto hist\u00f3rico, proviene de diversas fuentes: Presupuesto Institucional 187 millones de soles; Presupuesto con opini\u00f3n favorable del sector 203 millones de soles; Obras por Impuestos &#8211; OxI 250 millones de soles y Facilidad Financiera 116 millones de soles.<\/p>\n\n\n\n<p>En la conferencia de prensa, el gobernador estuvo acompa\u00f1ado por el gerente General Regional, C\u00e9sar Abarca Vera, el gerente Regional de Infraestructura Dalmer Ascue y el subgerente de Programaci\u00f3n Multianual de Inversiones OPMI, Caleb Pillaca Janampa, quienes ratificaron el compromiso con el desarrollo de Apur\u00edmac.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/475854467_1038664834965483_4481497887951210667_n-1024x683.jpg\" alt=\"\" data-id=\"15803\" data-full-url=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/475854467_1038664834965483_4481497887951210667_n.jpg\" data-link=\"https:\/\/drtcapurimac.gob.pe\/portal\/?attachment_id=15803\" class=\"wp-image-15803\" srcset=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/475854467_1038664834965483_4481497887951210667_n-1024x683.jpg 1024w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/475854467_1038664834965483_4481497887951210667_n-300x200.jpg 300w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/475854467_1038664834965483_4481497887951210667_n-768x512.jpg 768w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/475854467_1038664834965483_4481497887951210667_n-1536x1024.jpg 1536w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/475854467_1038664834965483_4481497887951210667_n.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"650\" src=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476142892_1038664871632146_2083435305044826503_n-1024x650.jpg\" alt=\"\" data-id=\"15804\" data-full-url=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476142892_1038664871632146_2083435305044826503_n.jpg\" data-link=\"https:\/\/drtcapurimac.gob.pe\/portal\/?attachment_id=15804\" class=\"wp-image-15804\" srcset=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476142892_1038664871632146_2083435305044826503_n-1024x650.jpg 1024w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476142892_1038664871632146_2083435305044826503_n-300x190.jpg 300w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476142892_1038664871632146_2083435305044826503_n-768x487.jpg 768w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476142892_1038664871632146_2083435305044826503_n-1536x974.jpg 1536w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476142892_1038664871632146_2083435305044826503_n.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476132175_1038664721632161_9149412053359015571_n-1024x683.jpg\" alt=\"\" data-id=\"15805\" data-full-url=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476132175_1038664721632161_9149412053359015571_n.jpg\" data-link=\"https:\/\/drtcapurimac.gob.pe\/portal\/?attachment_id=15805\" class=\"wp-image-15805\" srcset=\"https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476132175_1038664721632161_9149412053359015571_n-1024x683.jpg 1024w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476132175_1038664721632161_9149412053359015571_n-300x200.jpg 300w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476132175_1038664721632161_9149412053359015571_n-768x512.jpg 768w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476132175_1038664721632161_9149412053359015571_n-1536x1024.jpg 1536w, https:\/\/drtcapurimac.gob.pe\/portal\/wp-content\/uploads\/2025\/02\/476132175_1038664721632161_9149412053359015571_n.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Hist\u00f3rico presupuesto para obras en la regi\u00f3n El gobernador regional, Percy Godoy Medina, anunci\u00f3 en conferencia de prensa la ejecuci\u00f3n de m\u00e1s de 757 millones de soles en proyectos de&hellip; <\/p>\n","protected":false},"author":2,"featured_media":15805,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-15802","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"_links":{"self":[{"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/posts\/15802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/comments?post=15802"}],"version-history":[{"count":1,"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/posts\/15802\/revisions"}],"predecessor-version":[{"id":15806,"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/posts\/15802\/revisions\/15806"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/media\/15805"}],"wp:attachment":[{"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/media?parent=15802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/categories?post=15802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/drtcapurimac.gob.pe\/portal\/wp-json\/wp\/v2\/tags?post=15802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}